type
concept
created
Mon Apr 06 2026 02:00:00 GMT+0200 (Central European Summer Time)
updated
Mon Apr 06 2026 02:00:00 GMT+0200 (Central European Summer Time)
sources
raw/articles/ai-technical-spec.html, raw/notes/project_ai_roadmap
tags
feature phase-2 ai turnover
aliases
F2.1

Turnover Orchestration

abstract
AI feature F2.1 — 5-stage Kanban pipeline from notice-to-vacate through to new lease signed. Deposit calculator with 6 deduction criteria. Phase 2.

5 Stages

  1. Notice — tenant gives notice
  2. Inspect — move-out inspection
  3. Make-Ready — unit preparation, repairs, cleaning
  4. Listed — unit on market
  5. Leased — new tenant signed

Key Capabilities

Sources

Related


Detailed Spec

Full technical specification with models, endpoints, acceptance criteria: → wiki/specs/features/f2.1-turnover-orchestration